Revolutionize Liquid-Cooled Data Center Construction: DEE Prefab Liquid Cooling Pipes, Fast Connection Free of Field Welding
High-density AI computing power and liquid-cooled data centers have become the mainstream of industry development. However, traditional liquid cooling pipelines rely entirely on on-site cutting, hot work welding, and anti-corrosion and thermal insulation construction, which brings prominent industry pain points such as long construction cycles, frequent welding leaks, uneven quality of anti-corrosion and thermal insulation, high hydraulic resistance of pipelines and large heat exchange losses. These problems have seriously restricted the rapid large-scale implementation of liquid-cooled computer rooms. Relying on its experience in compiling multiple industry standards for prefabricated pipelines, DEE has launched the factory-prefabricated complete liquid cooling pipeline network system, completely revolutionizing the liquid cooling construction mode with a modular prefabricated pipeline solution.
Contact Us dee-energy@outlook.com
This product delivers factory prefabricated complete pipeline transportation solutions for liquid-cooled data centers. Supported by BIM 3D design and high-precision CNC machining, all liquid cooling pipelines undergo unified factory processing including cutting, seamless welding, pre-assembly forming, high-pressure hydraulic testing, anti-corrosion coating and thermal insulation treatment, forming standardized pipeline assembly modules.
The finished modules can be transported directly to the site and connected via standardized quick couplings. No on-site welding or secondary anti-corrosion and thermal insulation work is required throughout installation, drastically shortening on-site pipeline construction duration and eliminating construction risks such as leakage and blockage at the source.
Adopting an optimized low-resistance hydraulic design, the pipelines improve liquid cooling heat exchange efficiency. Suitable for liquid medium delivery of fully prefabricated data centers, liquid cooling containers and cooling station skids, the product supports customized design tailored to project requirements, delivering stable, efficient and leak-proof pipeline transportation for liquid cooling systems.